Deck replacement in Joondalup: old decks removed and rebuilt
Deck replacement in Joondalup means taking out a deck whose frame has failed and building a new one in its place. In a deck rebuild the old boards and frame are removed, the footings are checked instead of assumed, and a new frame and boards go in. We arrange rebuilds across the City of Joondalup.
When is a deck rebuild the right call?
When the frame, not the surface, is what has worn out. Boards are the part of a deck you can swap. Once decay or movement has spread through the frame, there is nothing solid left to fix new timber to.
These are the signs that it is time to replace an old deck:
- The deck bounces, sways or has dropped at one side.
- Soft timber turns up in several joists or bearers, not just one. Bearers are the main beams that sit on the stumps and carry the joists.
- Stumps have rotted at ground level or tilted.
- The frame sits so close to the ground that it never dries, so new timber would go the same way.
A deck that is grey and rough on top but solid underneath does not need replacing. Look after it yourself and keep using it. Our page on deck repairs in Joondalup explains where patching an old deck stops paying, and the repair or replace deck check gives a quick first answer.
Does the whole deck have to go?
Not always. A rebuild takes one of two forms.
A full replacement removes everything down to the ground and starts again. It is the answer when decay or movement runs through the frame, or when you want a different size, height or board.
A section rebuild deals with one part that has failed while the rest proves sound. That section comes out down to its footings and is built again with new frame and new boards. It is still structural work, not a handful of boards swapped.
What gets reused and what does not?
Very little of a failed deck is worth keeping, and nothing is kept on trust.
| Part | Reused? | Why |
|---|---|---|
| Boards | Rarely | Brittle, full of old fixing holes, often split on lifting |
| Joists and bearers | Only if proven sound | Hidden decay shows once boards are off |
| Footings | Checked one by one | Size, depth and position must suit the new deck |
| Fixings and brackets | No | Rusted or fatigued |
Footings deserve the most care. A footing is the concrete pad or pier in the ground that a stump or post stands on. Old ones may be shallow, undersized or in the wrong spot for a new frame layout. The City sits on coastal sand, so a footing has to be deep and wide enough to stay put. A footing that passes is used again, and one that does not is replaced.
How do you replace an old deck, step by step?
To replace an old deck properly, the work runs in this order:
- Inspection and measure. The existing deck is checked above and below, and the new one is agreed. The work is done by an independent licensed contractor, who provides the written quote.
- Rules check. Height, area and boundary distances are compared with the City’s requirements before anything is ordered.
- Strip out. Boards come off first, then joists and bearers, then stumps. The house wall is checked where the old frame met it.
- Footings. Existing footings are tested and new ones set where needed.
- New frame. Stumps, bearers and joists go in, spaced to suit the chosen boards.
- Boards. Boards are laid with even gaps and fixed with screws suited to the location.
- Finish and clean up. Timber boards are oiled, and the old deck is taken off site.
Should the new deck be timber or composite?
Either works, and the choice mostly comes down to upkeep. Hardwood has a natural grain, and it needs oiling by its owner to keep its colour. Our page on timber decking in Joondalup compares merbau, jarrah and spotted gum.
Composite boards do not need oiling and will not splinter, but a scratch cannot be sanded out. They often need joists set closer together than an old timber deck has, one more reason old frames are seldom reused. See composite decking in Joondalup for where it suits.
What a deck rebuild costs depends on the size and height of the new deck, how much of the old footing work can stay, the boards you choose and how easy it is to carry the old deck out and the new materials in. The guide to what affects the cost of a deck explains each one.
What do the City’s rules mean for a replacement deck?
A new deck has to meet today’s rules, whatever the old one did. A deck that has stood for decades is not proof that its height or position was ever approved.
The City of Joondalup’s position, in brief:
- For a single house or grouped dwelling, development (planning) approval is not required for decking 500mm or less above natural ground level.
- Decking higher than 500mm can avoid planning approval if it meets the R-Code setbacks for the lot’s density coding.
- A deck within 7.5m of a side or rear boundary needs a privacy screen at least 1.6m high.
Building permits are separate from planning approval. Confirm what your deck needs with the City on 9400 4000, and see the City of Joondalup decks page for the source wording. Our guide to council approval for a deck in Joondalup has more detail.
Where we replace decks
Close to the beach in Kallaroo, rusted fixings and brackets can finish a deck before its timber gives out, so a rebuild there goes back together with stainless steel. In Heathridge, Beldon and Craigie, a deck that has already been patched more than once is worth a proper look underneath before more money goes into it.
For a deck in Padbury or Kingsley that sat too close to the ground, a rebuild is the chance to lift the frame clear of garden beds and let air move under it.
Deck replacement questions
Can the old frame be kept and only the boards replaced?
Sometimes. If the joists, bearers and stumps are all solid, correctly spaced for the new boards and high enough off the ground to stay dry, new boards can go onto the existing frame. That has to be proven with the old boards off, not guessed from above.
Can the new deck be a different size or shape?
Yes, and replacement is the time to do it. Once the old deck is gone, the new one can be wider, a different height, or stepped to suit how you use the yard. Changes to height, area or distance to a boundary can bring City of Joondalup rules into play, so the design is checked against them first.
Do I need council approval to replace an existing deck?
It depends on the deck. For a single house or grouped dwelling, development (planning) approval is not required for decking 500mm or less above natural ground level. Building permits are a separate question, so confirm with the City of Joondalup on 9400 4000.
Is it worth patching an old deck before deciding to replace it?
Only if the frame is sound, and patching is not work the contractor takes on. Fitting new boards to a rotting frame means paying for boards twice, because they come up again when the frame is finally dealt with. If the frame is soft, cracked or moving, a deck rebuild is the better use of the budget.
Get a free quote
Tell us about the deck you want built or replaced. It takes about a minute, and the quote costs nothing.
Thanks, your request has been sent
The contractor will be in touch to arrange a time to visit and measure up. If it is urgent, calling is quicker.
Prefer to talk it through?
What happens next
- Your enquiry goes to a licensed decking contractor who works in your area.
- They contact you and arrange a time to visit, measure up and talk through options.
- You get a written quote from them directly, with no obligation.