What affects the cost of a deck?
The short answer
What affects the cost of a deck most is its size, how high it sits off the ground, the footings it needs, the boards you choose and how easy the site is to reach. On a rebuild, taking the old deck out is part of it too. Stairs, balustrades, privacy screens, approvals and stainless steel fixings near the coast all add to it. Across the City of Joondalup these vary so much between yards that an honest figure only comes from a site inspection.
Why do two decks of the same size cost different amounts?
Because size is only one of the things being paid for. A deck is a frame, a surface, a set of fixings and a lot of labour, and each of those changes with the yard it is built in.
Every deck job has a part you can see, the boards, and a part you cannot: the frame, the footings and the ground under them. Quotes differ most over the hidden part, which is also the part that decides how long the deck lasts.
It helps to know the frame terms before reading a quote. Stumps or posts stand on footings in the ground. Bearers are the main beams that sit on the stumps. Joists run across the bearers and carry the boards. The boards are fixed to the joists with screws or nails, called fixings.
Which factors move the cost of a deck up or down?
The table lists the main ones. None of them has a fixed weight, and on any one job two or three will matter far more than the rest.
| Factor | Why it matters | What moves it up or down |
|---|---|---|
| Size and shape | Sets the amount of timber and labour | Up with area, angles, curves and borders. Down with a plain rectangle |
| Height off the ground | Sets how much structure is under the boards | Up with taller posts, bracing and working at height. Down when low, flat and easy to reach |
| Footings | Carry the whole deck | Up with more posts, deeper holes and hard digging. Down where sound footings can be reused |
| Old deck on site | Has to be removed and disposed of | Up with size, height and hard access. None on bare ground |
| Board material | Boards are the largest material item | Varies with timber species, board width and thickness, or composite range |
| Access | Sets how long everything takes to carry | Up with narrow side paths, steps and slopes. Down with open access |
| Stairs, balustrades, screens | Slow, detailed joinery | Up with each one added and with height |
| Approvals | Drawings, forms and waiting time | Up when planning approval or a permit applies |
| Coastal fixings | Stainless steel costs more than galvanised | Up near the ocean, where it is worth it |
Size and shape
More deck means more boards, more frame and more hours. A small deck still needs the same setting out, though, so halving the size does not halve the job. Shape matters as much as area. A rectangle uses boards efficiently. Angled corners, curves, a border board around the edge or boards laid on the diagonal all mean more cutting and more waste.
Height off the ground
A deck close to the ground has a short, simple frame, but it needs enough clearance underneath for air to move, and sometimes that means digging. As a deck gets higher it needs longer posts, deeper footings and bracing to stop it swaying. Once it is high enough that a fall could hurt someone, it needs a balustrade, and it usually needs stairs. A balustrade is the railing and infill that guards the open edge. This is why raised decks in Joondalup are priced as a different kind of job from a low deck of the same area. Ground matters here too: the City of Joondalup sits on coastal sand, which affects how stumps and footings are set.
Board material
Hardwood species differ in what they cost to buy and how hard they are to work. Wider or thicker boards cost more per board. The page on timber decking in Joondalup compares merbau, jarrah and spotted gum. Composite boards are a manufactured mix of wood fibre and plastic. They come in ranges at different levels, often use a hidden clip system, and some need the joists set closer together than timber does. See composite decking in Joondalup for how the two compare.
Access
Every board, bag of concrete and length of frame timber has to get from the street to the backyard, and on a rebuild the old deck has to come out the same way. A narrow gate, a flight of steps, a steep block or a route through the house adds time to every part of the job.
Stairs, balustrades and screens
These are the slowest parts of a deck to build, metre for metre. Stairs have to be set out exactly, and a privacy screen is a small structure in its own right that catches the wind.
Approvals
Some decks need planning approval, a building permit or both, depending on height, size and how close they sit to a boundary. Where they apply, the job includes drawings, application fees and time before work can start. The rules are on the City of Joondalup’s decks page. For what your deck needs, confirm with the City on 9400 4000.
Coastal fixings
Salt air rusts ordinary fixings, so near the ocean a deck should be screwed down with stainless steel. Stainless steel costs more than galvanised, and a deck uses a great many screws. In coastal suburbs such as Burns Beach, Mullaloo and Sorrento it is worth it.
How does a rebuild differ from a new deck in what drives the cost?
Both end with a new deck, and everything in the table applies to both. A rebuild adds three questions that a deck on bare ground never raises.
Removal and disposal. The old deck has to be pulled apart, carried out and taken to a tip. That is driven by the size of the old deck, how high it stands and how far everything has to be carried. Treated pine should not be burnt or mulched, so disposal is a real line in the quote.
What can be reused. Usually less than owners hope. Old boards and fixings are not reused. Joists and bearers are kept only if they prove sound once the boards are off and suit the spacing the new boards need. Footings are the most likely survivors, and each one is checked for size, depth and position. Nobody can see the top of a joist or the base of a stump until the deck is opened up, so a rebuild quote should say what happens if less can be kept than expected.
Changed size or height. A rebuild that follows the old footprint can make the most of what is already in the ground. Once the new deck is larger, higher or a different shape, old footings end up in the wrong place and the job is priced as a new build with removal added. A change in height or position also reopens the approvals question. The page on deck replacement in Joondalup explains how a rebuild runs from strip out to finished boards.
How do you get an accurate quote?
An accurate quote comes from an accurate picture of the job. You can help with that before anyone visits.
- Measure the deck you want roughly, length by width, and note how high it will sit at its highest point.
- Take photos of the site. For a rebuild, photograph the whole deck and, if you can do it safely, the frame and stumps underneath.
- For a rebuild, write down what the old deck is doing: soft spots, movement, a dropped corner, rust marks.
- Decide what you want to end up with. A like for like rebuild, a larger deck and a change from timber to composite are three different quotes.
- Mention access honestly, including side gate width and any steps.
- Ask for the quote in writing, with the materials named.
A figure given without seeing the site, or without looking under an old deck that is being replaced, is a guess. Asking for a free quote through this site puts you in touch with an independent licensed contractor who inspects first.
How do you compare two deck quotes fairly?
Put them side by side and check they describe the same deck. Most large gaps between quotes turn out to be gaps in what is included.
- Boards: the same species or composite range, the same width and thickness?
- Frame: new or reused? If new, what timber and what treatment level?
- Fixings: stainless steel or galvanised, screws or nails, visible or hidden?
- Footings: how many, and how are they set?
- Finish: is oiling included, and how many coats?
- Removal: does the quote cover taking away the old deck and the offcuts?
- Approvals: who prepares and lodges anything the City needs, and is it in the figure?
- Unknowns: on a rebuild, how does each quote deal with footings or frame that cannot be kept once the old deck is opened up?
- Exclusions: what does each one say it does not cover?
If one quote is much lower, find the line that explains it before you decide. It may be a fair saving, such as reusing footings that have been checked. It may also be galvanised fixings on a coastal deck or a frame nobody looked at.
Related questions
Why can't I get a deck price over the phone?
Because the things that decide it cannot be seen over the phone. Two decks of the same size can be very different jobs once height, footings, access and the boards chosen are taken into account. A contractor needs to see the site, and on a rebuild look under the old deck, before a figure means anything.
Is rebuilding an old deck less work than building a new one on bare ground?
Not usually. A rebuild adds the labour of pulling the old deck apart and carting it away, and the new deck is still a full frame and a full set of boards. It only comes out ahead where existing footings prove sound and sit where the new frame needs them, which has to be checked, not assumed.
What should a written deck quote include?
It should name the board timber or composite and its size, the frame timber, the type of fixings, the footings, the finish and number of coats, removal of the old deck and rubbish, who handles any approvals, and what is excluded. On a rebuild it should also say what happens if the old footings turn out to be unusable.
Get a free quote
Tell us about the deck you want built or replaced. It takes about a minute, and the quote costs nothing.
Thanks, your request has been sent
The contractor will be in touch to arrange a time to visit and measure up. If it is urgent, calling is quicker.
Prefer to talk it through?
What happens next
- Your enquiry goes to a licensed decking contractor who works in your area.
- They contact you and arrange a time to visit, measure up and talk through options.
- You get a written quote from them directly, with no obligation.