Joondalup Deck Co
Menu

Decking in Currambine

A new deck goes through six stages between the first idea and the first barbecue, and knowing them makes any quote easier to read. We arrange new timber and composite decking in Currambine, built by a licensed contractor who covers the City of Joondalup. Send the form or call for a free site visit and quote.

Six stages of a new deck, in the order they happen

  1. Decide what it is for. A deck for a table of eight is a different shape from one for two chairs and a morning coffee. List what will sit on it and how people will walk from the back door to the lawn, then size it to that.
  2. Choose the boards. Hardwood gives you real grain and wants oiling to hold its colour. Composite keeps one even colour and wants washing only. Our pages on timber decking in Joondalup and composite decking in Joondalup set out where each one earns its place.
  3. Check height and approvals. Currambine comes under the City of Joondalup. For a single house or grouped dwelling, development (planning) approval is not required for decking 500mm or less above natural ground level. Go higher, or build close to a fence, and more rules apply. Read the City’s decks page and confirm the building permit position on 9400 4000 before anything is ordered.
  4. Footings and frame. The whole City sits on coastal sand, so stumps and footings are sized and set for sand. Bearers and joists follow. Nobody admires this stage, yet it decides whether the deck still feels solid long after the boards have weathered.
  5. Boards and fixings. Boards go down with an even gap so water drains and timber has room to move. Ask whether they will be screwed through the face or held with hidden clips. It changes the look, and it changes how easily one board can be lifted later.
  6. Finishing. Edges are trimmed, steps and fascia boards go on, and a timber deck gets its first coat of oil. From here the deck is yours to keep clean and oiled.

Which stages move the quote

Stages one and four do most of it. Size sets how much of everything is needed. Height sets how much frame goes underneath and whether stairs or a balustrade join the job. Board choice comes next, then how hard it is to get materials into the yard. Our guide to what affects the cost of a deck takes each of these in turn, with no figures, because a figure means nothing until someone has measured your yard.

Fitting the plan to your yard

If your block is close to level, a low deck straight off the back of the house is the simplest build and keeps you on the easy side of the height rule. If the house floor sits well above the lawn, decide early whether the deck meets the floor or steps down to the grass, because that choice drives stages three and four. On a smaller yard, give the lawn a say. A deck that swallows the whole space can leave nowhere for kids or a dog, and a narrower deck with a wide step down often works harder.

Stages four to six, seen from above

Drag the handle to go from bare ground to frame to finished boards.

Illustration. Drag the handle, or use the arrow keys, to build the deck from bare ground. A bare sandy backyard behind a house, set out with string lines and marked footing positions. The same yard with the deck frame built: stumps, bearers and evenly spaced joists. The finished deck: hardwood boards laid over the frame and oiled to a deep red, with fixings sunk and even gaps.

Three things Currambine owners ask at the planning stage

How big should a backyard deck be?

Start with the furniture. Mark out the table with its chairs pulled back, the barbecue with room to stand at it, and a clear walkway from the door to the lawn. Tape or a garden hose on the ground works well. The outline you end up with is usually smaller than the first guess, and it leaves more yard.

We are also planning a patio roof. Which goes in first, the roof or the deck?

Plan them together even if they are built apart. Roof posts need their own footings, and it is far easier to set those before the deck frame is in the way. If the deck comes first, tell the contractor where the posts will go so the frame can be laid out around them.

Can a deck be built over existing paving or a concrete slab?

Often, yes, if the surface underneath is sound and water can still drain away. The catch is height. A frame, plus boards, on top of paving can finish above the door sill, so the contractor measures that first. Sometimes lifting the pavers and starting from the sand is the better build.

New decks north, south and east of Currambine

Currambine sits inland of Iluka, across Marmion Avenue, and has its own train station. The same contractor builds new decks in the suburbs either side of it.

Get a free quote

Tell us about the deck you want built or replaced. It takes about a minute, and the quote costs nothing.

Your details go to an independent licensed decking contractor, who will contact you to arrange a quote. See the privacy policy.

Prefer to talk it through?

Call 04xx xxx xxx

Calls to the number on this site may be recorded.

What happens next

  1. Your enquiry goes to a licensed decking contractor who works in your area.
  2. They contact you and arrange a time to visit, measure up and talk through options.
  3. You get a written quote from them directly, with no obligation.
Call now Get a quote