Decking in Duncraig
Rebuilding a deck that went in long ago is a fresh design job, because the rules, the fixings and the boards have all moved on since. For decking in Duncraig we arrange full rebuilds and new raised decks, planned to City of Joondalup requirements. A licensed contractor inspects the old deck and gives you a free quote.
How a new deck goes together
Bare ground, then the frame, then the boards. Drag across to see each stage.
The old deck versus a rebuild today
Duncraig is at the southern end of the City of Joondalup, inland of Sorrento. If your deck has been there a long time and its frame has had it, the tempting brief is “the same again, but new”. That is rarely the right plan. The left column describes what an older deck may have; yours might differ.
| The old deck | A rebuild today | |
|---|---|---|
| Rules | Built to whatever applied, or was assumed, when it went up | Checked against the current ones. For a single house or grouped dwelling, development (planning) approval is not required for decking 500mm or less above natural ground level. |
| Height and screening | Set level with the floor, with little thought for the view into next door | Chosen on purpose. A deck within 7.5m of a side or rear boundary needs a privacy screen at least 1.6m high. |
| Fixings | Nails, some lifted and some rusted through | Screws chosen to suit the board, with proper connectors and bolts where frame members meet |
| Footings | Timber stumps in the ground or shallow pads of unknown depth | New footings sized for the load and for the coastal sand under the City |
| Board choices | Whatever the builder of the day had on hand | Merbau, jarrah, spotted gum or composite, picked for sun, shade and how much upkeep you want |
A rebuild therefore begins with the yard and the current rules, and the old deck is only a guide to what you liked and what annoyed you. The sequence of the work is covered under deck replacement in Joondalup. And if the old deck passes a hard look underneath, there is no need to rebuild it at all.
Raised decks on sloping blocks
Parts of the suburb are hilly. If your block drops off behind the house, a deck set level with the house floor may sit low at one end and well above the ground at the other. Three things follow.
The high end sets the terms. The outer edge is where height, screening and balustrade questions are decided, not the step by the door. Ask the City how height is measured on a sloping site before assuming which rule applies.
Tall posts need bracing. The longer a post is, the more the deck wants to sway, so raised frames are braced diagonally in both directions and their footings go deeper.
Stairs and edges are part of the structure. Steps down to the lower yard, and a balustrade wherever the drop calls for one, are designed with the frame and not added afterwards.
More on the structure: raised decks in Joondalup.
What to ask the City before you settle the design
Ring the City of Joondalup on 9400 4000 with the planned height and the distance to each boundary, and ask:
- Does this deck need planning approval? Decking higher than 500mm can avoid planning approval if it meets the R-Code setbacks for the lot’s density coding. Ask what your lot’s coding is and what setbacks go with it.
- Does it need a building permit? Do not assume the answer from the fact that a deck stood there before. Confirm it for the new one.
- Where is a screen required, and what counts as one? Get this settled early, because a screen changes the look of the deck and the posts that hold it.
Its decks page is the source for all of the above. For a plain-English walk through it, read our guide on council approval for a deck in Joondalup.
Sloping blocks and screens: Duncraig questions
Which materials work for a deck privacy screen?
Timber battens, composite slats, louvres and frosted glass are all used. What matters to the City is that the screen does its job at the required height, so ask how much openness between slats is acceptable before choosing a style. A screen is also a sail in a strong wind, which means its posts are designed as part of the frame.
Can a raised deck stand on its own, without being fixed to the house?
Yes. A freestanding deck has its own row of posts beside the house wall and relies on bracing for stiffness, with nothing bolted into the building. It suits walls that are hard to fix into, or owners who would prefer to leave the house untouched. It needs more footings, so it changes the scope of the quote.
On a slope, should the deck step down or stay on one level?
One level gives the biggest usable floor and the easiest walk from the house, but the outer edge ends up highest. Stepping the deck down in two platforms keeps each part closer to the ground, which can mean lighter structure and less screening. The right answer depends on the fall of the block and how you will use it.
Around Duncraig
Towards the coast and further inland from Duncraig, old decks raise the same questions.
Get a free quote
Tell us about the deck you want built or replaced. It takes about a minute, and the quote costs nothing.
Thanks, your request has been sent
The contractor will be in touch to arrange a time to visit and measure up. If it is urgent, calling is quicker.
Prefer to talk it through?
What happens next
- Your enquiry goes to a licensed decking contractor who works in your area.
- They contact you and arrange a time to visit, measure up and talk through options.
- You get a written quote from them directly, with no obligation.