Decking in Greenwood
Once a deck has reached the end of its life, the rebuild happens in your backyard while you live around it. Decking in Greenwood covers new hardwood and composite decks, and failing decks replaced from the ground up, arranged for homes across the City of Joondalup. Inspection and quote come free from a licensed contractor.
What having a deck built is like, stage by stage
Greenwood lies east of the Mitchell Freeway and south of Hepburn Avenue. Whether a worn-out deck is being replaced or a first one added, this is how the job looks from the owner’s side of the back door.
Before the build
The site visit. The contractor measures up, checks levels and asks how you want to use the deck. They will also walk the route from the street to the yard, because everything arrives that way: long lengths of timber, bags of concrete, tools.
The decisions. Size, height, board type and any stairs are settled now. Our page on timber decking in Joondalup compares the hardwoods. The guide to what affects the cost of a deck explains why one design is quoted higher than another.
A note on approval. For a single house or grouped dwelling, development (planning) approval is not required for decking 500mm or less above natural ground level. For permits, confirm with the City on 9400 4000 or see its decks page.
Your part. Clear furniture, pots and the barbecue from the work area and the path to it. Agree where materials will be stacked. Let the neighbours know.
While it is being built
The order of work. Footings first. Greenwood, like the City around it, is coastal sand, and the holes and concrete are sized for that. Then the frame, then the boards, then stairs, edges and screens.
Noise. Expect saws and impact drivers through the working day.
Where things sit. Timber is stacked flat and off the ground, usually on the driveway or the lawn nearest the access.
Pets and children. Open footing holes are a hazard until they are filled. A bare frame looks like a floor and is not one, since the gaps between joists are wide enough to step through. The side gate will also be open far more than usual, so dogs need to be inside or elsewhere.
The first weeks after
When you can use it. Ask at handover. The answer depends on the board and whether any coating needs to cure.
What new hardwood does. Some species, merbau especially, release brown tannin when they first get wet. It is normal and it stops, but it can mark paving and render below, so ask how run-off will be managed. Boards also settle as they season, and the gaps between them may open a little.
First-season care. This part is yours. Keep the deck swept. Sit pot plants on feet so water does not pool beneath them. For the first coat of oil and the timing of the next, follow the product label and the contractor’s advice instead of a rule of thumb. Composite needs none of that, only a wash now and then.
When an existing deck comes out first
Replacing a deck adds one stage at the front. The old boards and frame are taken apart and carried out the same way the new materials come in, and old stumps are dug out so new footings can go where the design needs them. Expect a noisier, dustier start and a trailer or skip out the front. Read deck replacement in Joondalup for what is and is not reused.
One honest check before you commit: a deck that still feels solid from end to end may have years left. Keep caring for it. A rebuild is for a frame that is failing.
See the stages before they happen in your yard
Slide from cleared ground to the frame to the laid boards.
Living through a deck build: Greenwood questions
There is reticulation where the deck is going. What happens to it?
Tell the contractor at the site visit and, if you can, mark where the pipes and sprinklers run. Lines under the deck area are usually capped or rerouted before the footings are dug, since a leak under a finished deck is hard to reach. Sprinklers that would spray the new boards are worth moving at the same time.
Do I need to be home while the deck is built?
Not all day. The contractor needs access to the yard, a power point and somewhere to stack materials, and those can be arranged in advance. It helps to be there at the start, when the set-out is confirmed, and at the end for the handover. In between, a phone number is usually enough.
Can a deck be built in wet weather?
Work carries on through light showers, but heavy rain stops some stages, particularly digging footings and pouring concrete. Wet weather is a reason to expect pauses and not a reason to avoid building. Timber delivered in the wet may be left to dry before boards are fixed, and any coating waits for dry conditions as the label directs.
Next door to Greenwood
A build runs the same way for owners in the suburbs next to Greenwood.
Get a free quote
Tell us about the deck you want built or replaced. It takes about a minute, and the quote costs nothing.
Thanks, your request has been sent
The contractor will be in touch to arrange a time to visit and measure up. If it is urgent, calling is quicker.
Prefer to talk it through?
What happens next
- Your enquiry goes to a licensed decking contractor who works in your area.
- They contact you and arrange a time to visit, measure up and talk through options.
- You get a written quote from them directly, with no obligation.